Skip to content
Book a demo call with us and see BeeWorkforce set up around your team, free

Capacity and FTE Calculator

The capacity and FTE calculator shows how many full-time people a workload needs, after shrinkage. Enter the workload in hours, available hours per full-time person and expected shrinkage.

Full-time people needed12.1

Your numbers stay in your browser.

What the result means

Shrinkage reduces the hours each person can actually give to the workload, so you need more people than the raw hours suggest.

The formula

Required FTE = workload hours ÷ (available hours per FTE × (1 − shrinkage))

  • FTE: full-time equivalent
  • Shrinkage: share of hours lost to leave, training, breaks and absence

Example

With the starting values (workload in the period 1600 hours; available hours per full-time person 176 hours; expected shrinkage 25 %):

  • Full-time people needed: 12.1

How to improve it

  • Measure real shrinkage instead of guessing
  • Plan leave ahead of busy periods
  • Revisit the plan each month

Track this automatically with BeeWorkforce

BeeWorkforce records the inputs behind many of these numbers while people are punched in, never keystrokes. See Capacity planning, or get these numbers from real data, free.

Last reviewed 20 Nov 2026.

Capacity and FTE questions from team leads

How is the capacity and fte calculated?

Required FTE = workload hours ÷ (available hours per FTE × (1 − shrinkage)). The calculator shows each step's result as you type.

How do part-time staff count in FTE?

In proportion to their hours. Someone working 20 hours in a 40-hour week counts as 0.5 FTE.

Should contractors count in FTE?

Count them if they do the work you're planning capacity for, and keep them separate in reports if you budget for them differently.

What shrinkage should I use?

Your own measured figure is best. Use the BPO shrinkage calculator with last month's numbers to find it.

Is my data saved?

No. Everything you type stays in your browser. Nothing is sent to us or stored, unless you copy a link to your result, which puts the numbers in the address.

Can I download the result?

Use "Print or save as PDF" to keep a copy, or "Copy a link to this result" to share it with the same numbers filled in.

Can BeeWorkforce work this out from real data?

Yes, for the inputs it records, such as attendance, worked hours, idle time and project hours. See capacity planning in BeeWorkforce, free for 7 days for up to 10 users.

Visibility your team can trust. Try it free for 7 days.

Every feature, up to 10 users, no card needed. If you buy and it isn't right, get a full refund within 30 days of your first payment.

Abhishek ShahHimanshu VermaHiren Joshi
Talk to our team on your 30-min setup demoAbhishek, Himanshu or Hiren sets it up around your team